Our (Messy) Bathroom Renovation

A final “beauty shot” compliments of iPhone Panorama camera feature.

There’s nothing like a good old renovation to get you feeling frantic about your home. I posted earlier this spring about preparing for our bathroom renovation, and it’s well-well-well underway!

I mentioned before we decided not to DIY this product project because it was complicated and messy and would have taken us a significant amount of time in addition to the other projects we already have going on!

After we removed the toilet, lighting fixtures, medicine cabinet, and vanity we were ready for the team to come in. And come in they did.

bath1

We had a Home-Alone-2-style tube hanging out our guestroom window for all the debris. I can’t say I miss demo and the heavy mess you have to deal with.

bath10

In order to make this bathroom larger we reconfigured the hall closet, a guest bedroom closet, in addition to moving a wall between the bathroom and the guestroom.

bath7We clearly weren’t thinking ahead! Our bedroom was behind the sealed-off construction area!

Obviously there are 1 million elements going on in this process. As a quick overview, after they tore down the walls and ripped up the floorboard, we were left with our new open space. We moved the doorway to the bathroom over by a few inches to maximize the new square footage we were gaining. (Originally there was a radiator behind the door, which we removed.)

bath2

Recessed mirror frames and plumbing for new double sink.

Rough plumbing was put in, and a significant amount of work needed to be done to move the toilet, like cutting through the floor joists and reconfiguring plumbing. From an amateur’s perspective, you would think you can move things anywhere when you are gutting a room, but that simply just isn’t the case!  bath3 New plywood subfloor, toilet plumbing moved and framing for new window is added.

Next, the plywood floor was put down and they cut down the wood floor in the guestroom where the new wall will be. The new wall structure was put up. Then we had rough electrical added (outlets, light switches, canned lighting, and where we’d like to put the lights above our bathroom mirrors).

bath8 bath5New guest room closet and rough electrical is added.

Additionally, we moved the access panel to our attic from the main hallway into the new guest bedroom closet. This allowed us to reconfigure our cam lights in the hallway. It’s easy to see how renovations can quickly spread and grow – you’re doing one thing you might as well do them all at once!

bath6Building the new wall between the bathroom and guestroom.  bath9Yep. I showered in that. 

bath11The skylight will no longer be in the bathroom, but become a part of the attic. It’s old and once it starts leaking we don’t want to have to rip the new ceiling out. Plus it will no longer be centered in the bathroom and will provide natural light in the attic.

bath4Recessed shelves for the shower and you can see where the old window frame in the shower was.

Although it’s been messy and we’ve been without a shower (for far too long) I’m extremely excited for our new bathroom and it’s definitely been worth the wait.

Have you experienced a messy renovation? Does it scream “adventure!” or “disaster!” to you? I can’t decide which one it is for me!

 

Save

Related Post

3 comments

  1. When we were going through construction at 30 Cent, a guest said it was like living in a tree house with a shower! It didn’t make me feel better in the moment, but I’ve been there – showering in a tub with a tarp and everything exposed. Hopefully you guys are done soon!

Leave a Reply

Your email address will not be published. Required fields are marked *